- Finish polishing- Back in progress as of 1-1-2015 and almost complete!
- Black trim tape needed on all windows after tinting
- Run wire for new LED lighting
- Build bathroom utility closet
- Awnings need for right side and rear
- Build small table that will double for front and middle of Airstream
- Build pocket doors (rear)
- Fabric wall (passenger side done)
- Polish aluminum trim inside airstream
- Re-chrome main door handle
- Polish hubcaps.
- Hood vent for stove
- After all large sections of interior are built they will need To be stained
- All outlet covers need to be replaced and installed
- USB outlets need to be installed
- Ducted AC unit needed for bedroom
- Design and install new vista view covers
- Design center ceiling
- Remodel bathroom- in progress
- Install center ceiling
- Install pocket lights (middle of airstream)
- Install LED lighting in ceiling
- Install switches for LED lighting
- Install individual lights in bedroom
- Install LED in shower
- Install LED strips in drop ceiling
- Install outside shower
- Install outside LP connector
- Install central computer for Airstream
- Install outside power outlet
- Install new vent over kitchen
- install new interior- in progress
- Install sliding doors for bedroom and bathroom- in progress
Completed items:
- Build cabinet over water heater (Door for heater and slide out drawer for storage)-Done
- Remove old Airstream numbers and install new numbers-Done
- Fabric wall (left side bedroom)-Done
- Run air lines for airbeds-Done
- Tint all windows -Done
- Build beds (left and right side) with four drawers under them)-Done
- Fabric wall (left side bedroom)-Done
- New curtains for front area-Done
- Reinforce battery box
- Replace all running lights with stylish chrome lights- Done
- Purchase 1st generator-Done
- Build new shower-Done
- Build new bathroom sink-Done
- Build Closets-Done
- Build Table with two legs -Done
- Build front seating area -Done
- Build overhead storage (kitchen) -Done
- Build pocket door walls (Front) -Done
- Build entertainment center -Done
- Build overhead storage in kitchen -Done
- Install new radio -Done
- Install cabinet handles -Done
- Install TV-Done
- Install new fan with remote over table-Done
- Install roll down shades (bedroom, bathroom, kitchen)-Done
- Install Rear bedroom speakers-Done
- Install gaskets on all doors-Done
- Install tile on kitchen wall-Done
- Install awning on left side-Done
- Install handles on cabinet doors-Done
- Install wood floor-Done
- Install LED lighting over kitchen-Done
- Install Propane tank cover-Done
- Install new front speakers -Done
- Install new water heater -Done
- Install new furnace -Done
- Install new toilet -Done
- Install new batteries -Done
- Install fuse panel -Done
- Install new septic tank -Done
- Install new water pump -Done
- Install new stove -Done
- Install shower pan-Done
- Install Marinco shore line 30 amp power connector (Front and rear) - Done
- Install LP tank cover -Done
- Install 2nd pole for table -Done
- Install window rock guard for front -Done
- Install pressure regulator for water -Done
- Install Microwave-Done
- Install sliding drawers for pantry
- Replace copper with PEX -Done
- Purchase kitchen sink and facet -Done
- Overhead storage for bedroom -Done
- Custom cabinets for pantry -Done
- Slide out drawers in pantry-Done
- Replace main awning-Done
- Replace axles -Done
- Remove old antenna -Done
- New gaskets on all windows -Done
- Remove all interior -Done
- Run heating duct -Done
- Prep wood floor and paint -Done
- Paint walls -Done
- Cushions for front seating area -Done
- custom cabinets for kitchen -Done
- All windows and doors need seals replaced -Done
- Design heat vent outlet-Done
- Design sliding doors -Done
- Repair rear end sag -Done
- Change door light to LED -Done
Need to purchase:
- Purchase LED light switches
- Purchase surge protector needed
- Purchase New Fridge
- Purchase 2nd generator- first generator purchased
- Purchase all wood veneer to remodel interior
- Purchase all wood to remodel interior
- Purchase outdoor shower box
- Purchase Nuvite- on going
- Purchase wire for 12v lighting
- Purchase LED replacements for puck lights
- Purchase 3m adhesive for veneer (1 gallon)
- Purchase airline tickets to fly Wade out to help veneer
- Purchase converter to 120
- Purchase awning for rear and passenger side
- Purchase new awning fabric for main awning
Purchased so far:
- Purchase window rock guard for front -Done
- Purchase 1st generator-Done
- Purchase handles for inside-Done
- Purchase pressure regulator for water -Done
- Purchase wood flooring -Done
- Purchase new axles -Done
- Purchase fan w/remote for front (over table) -Done
- Purchase LED Running light -Done
- Purchase Toilet -Done
- Purchase propane tank cover -Done
- Purchase new septic tank -Done
- Purchase stove-Done
- Purchase water pump -Done
- Purchase window tint -Done
- Purchase gaskets -Done
- Purchase furnace -Done
- Purchase water heater -Done
- Purchase new batteries -Done
- Purchase gas detector -Done
- Purchase carbon detector -Done
- Purchase Cyclo buffer -Done
- Purchase Nuvite polish -Done
- Purchase shower pan -Done
- Purchase radio -Done
- Purchase tv -Done
- Purchase bathroom sink-Done
- Purchase speakers -Done
- Purchase PEX tubing -Done
- Purchase PEX crimps -Done
- Purchase curtain fabric -Done
- Purchase foam for seating -Done
- Purchase Fabric for seating -Done
- Purchase batteries -Done
- Purchase fuse panel -Done
- Purchase power converter -Done
- Purchase central computer -Done
- Purchase kitchen sink -Done
- Purchase kitchen faucet -Done
- Purchase bathroom faucet -Done
- Purchase shower head -Done
- Purchase fresh water hose needed -Done
- Purchase fresh water filter needed -Done
- Purchase weight distribution hitch -Done
- Purchase RV chocks -Done
- Purchase RV tongue foot-Done
- Purchase cabinet handles -Done
- Purchase main awning -Done
- Purchase metal for rear end sag-Done
- Purchase new tires -Done
- Purchase LP connectors -Done
- Purchase wood for overhead storage units -Done
- Purchase wood for front seating area -Done
- Purchase wood for pantry -Done
- Purchase wood for kitchen -Done
- Purchase wood for walls -Done
- Purchase wood for beds -Done
- Purchase wood for entertainment center -Done
- Purchase wood for rear floor -Done
- Purchase paint for floor -Done
- Purchase paint for walls -Done
- Purchase hinges for cabinets -Done
- Purchase soft close drawer sliders -Done
- Purchase generator -Done
- Purchase 30 amp cord -Done
- Purchase brake away unit -Done
- Purchase ball hitch -Done
- Purchase microwave -Done
- Purchase speaker wire -Done
- Purchase ducting for heating -Done
- Purchase flooring -Done
- Purchase sliding door hardware -Done
- Purchase hot water heater bypass -Done
- Purchase temporary AC unit -Done
- Purchase temporary fridgerator -Done
- Purchase table legs -Done
- Purchase original control panel -Done
- Purchase sewer kit -Done
- Purchase outdoor rug-Done
- Purchase sewer tube holder -Done
- Purchase plumbing (drain) -Done
- Purchase plumbing (on/off) valves -Done
- Purchase aluminum trim for table and kitchen -Done
- Purchase tile for kitchen -Done
- Purchase Buffing pads -Done
- Purchase aircraft stripper -Done
- Purchase hubcaps (4x) -Done
- Purchase tow connectors -Done
- Purchase tow brake controller -Done
- Purchase bedding -Done
- Purchase Airstream membership -Done
- Purchase Airstream numbers -Done
Nice to have:
- Solar power
- Generators switched to propane
- Aluminum propane tanks